This 5 unit switchgear was built with a two high feeder design and had a LBS-BKR-MET-FDR-FDR configuration. The lead time for the switchgear was just 12 weeks from purchase order to delivery.
RATING
25kV, 600A, 25kAIC
SWITCHING DEVICES
ABB NAL Loadbreak Switch
Eaton VCP-W
RELAY/METERS
SEL-751